Posted on 29/10/09
Long Lake production target put on hold
To the very long list of Long Lake's woes, add this one: Its owners no longer know when it will reach full production. Through the years of operational problems and resulting delays that have plagued the $6.1-billion oil sands project, Nexen Inc. and OPTI Canada Ltd. have maintained target dates for achieving its designed throughput. At one point, that date was late 2009. Then, late 2010.
The full text of this article has 173 words.
To continue reading this article, you will need to purchase this article.
Already have a member account? Login now



